Common Description
Equipped using the zero leak bidirectional checking sole-noid valves, this energy unit is developed for your operation of two independent circuits. Which are respectively for the key and subordinate platforms in the double scissors lift. Two cut-off valves are applied for lowering the machine manually in case of electrical power loss. If extra independent circuits are required for the application please get in touch with us for availability.
Remark: 1. Please consult our product sales engineer for your distinctive pump displacement, motor power or tank capability.
two. CSA or UL licensed motors are available upon request.
Particular Notes
one. The AC motor is of S3 duty cycle, which could only work intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean all the hydraulic parts concerned in advance of installation of the electrical power unit.
3. Viscosity of your oil shoud be 15~46 cst,plus the oil must be clean and cost-free of impurities,N46 hydraulic oil is advisable.
four. The energy unit must be mounted vertically.
5. Check the oil level during the tank following the initial operating on the energy unit.
6. Oil transforming is required after the original one hundred operation hours,afterwards the moment each and every 3000 hrs.